Replacing The Sas Raid Controller; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

Expansion cards and backup units
9.3.3

Replacing the SAS RAID controller

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
9.3.3.1

Required tools

Preliminary and concluding steps: tool-less
Replacing the SAS RAID controller:
– Phillips PH2 / (+) No. 2 screw driver
Mounting slot brackets:
– Phillips PH2 / (+) No. 2 screw driver
9.3.3.2

Preliminary steps

Perform the following procedures:
"Disabling BitLocker functionality" on page 85
Ê
"Disabling SVOM boot watchdog functionality" on page 86
Ê
"Shutting down the server" on page 65
Ê
"Disconnecting power cords" on page 66
Ê
"Extending the server out of the rack" on page 69
Ê
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
"Removing the server cover" on page 72
Ê
"Removing the air duct" on page 73
Ê
210
Upgrade and Maintenance Manual
70.
RX300 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents