Indicators On The Front Panel; Front Panel Controls And Indicators - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

17.3.3 Indicators on the front panel

17.3.3.1 Front panel controls and indicators

Figure 367: Front panel controls and indicators
Local diagnostic indicators
Pos. Indicator
HDD error
15
indicator
PSU error
13
indicator
Temperature
9
error indicator
CPU error
14
indicator
RX300 S7
Status
Description
HDD / SSD, SAS / SATA backplane or
orange on
RAID controller failure detected
Hot-plug PSU module failure detected
I
orange on
Operating temperature levels above
orange on
permitted limits
orange on
CPU prefailure event detected
Upgrade and Maintenance Manual
Only available in redundant PSU
configurations.
Appendix
555

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents