Concluding Steps; Removing 2.5-Inch Hdd / Ssd Modules; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

Hard disk drives / solid state drives
Ê Insert the HDD module into a drive bay and carefully push back as far as it
will go (1).
Ê Close the locking lever to lock the hard disk drive in place (2).
7.3.2.5

Concluding steps

Perform the following procedures:
"Performing a RAID array rebuild" on page 108
Ê
"Closing the rack door" on page 84
Ê
7.3.3

Removing 2.5-inch HDD / SSD modules

Customer Replaceable Units (CRU)
Average task duration: 5 minutes
7.3.3.1

Required tools

Preliminary and concluding steps: tool-less
Removing a 2.5-inch HDD / SSD module: tool-less
7.3.3.2

Preliminary steps

Perform the following procedures:
Ê Ensure that the HDD / SSD module to be removed is not combined into a
RAID array. If the drive is part of a RAID array, you first need to delete the
array using ServerView RAID Manager.
V
CAUTION!
All data on all HDDs / SSDs in the array will be lost! Be sure to back
up your data before deleting a RAID array.
I
For further information, please refer to the "ServerView Suite RAID
Management" user guide, available online at
http://manuals.ts.fujitsu.com.
154
Upgrade and Maintenance Manual
RX300 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents