Installing Memory Modules; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

Main memory
– In order to satisfy cooling requirements, populate memory channels on
alternating sides of the processor:
Order
1
2
3
4
10.2

Installing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes

10.2.1 Required tools

Preliminary and concluding steps: tool-less
Installing memory modules: tool-less

10.2.2 Preliminary steps

Perform the following procedures:
"Disabling BitLocker functionality" on page 85
Ê
"Disabling SVOM boot watchdog functionality" on page 86
Ê
"Shutting down the server" on page 65
Ê
"Disconnecting power cords" on page 66
Ê
"Extending the server out of the rack" on page 69
Ê
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
280
CPU 1
Channel A
Channel C
Channel B
Channel D
Upgrade and Maintenance Manual
CPU 2
Channel E
Channel G
Channel F
Channel H
70.
RX300 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents