Replacing The Modular Lan Controller; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

9.4.3

Replacing the Modular LAN controller

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Note on network settings recovery
I
When replacing network controllers or the system board, network
configuration settings in the operating system will be lost and replaced
by default values. This applies to all static IP address and LAN teaming
configurations.
Ensure to note down your current network settings before replacing a
controller or the system board.
9.4.3.1

Required tools

Preliminary and concluding steps: tool-less
Replacing the modular LAN controller:
– Phillips PH2 / (+) No. 2 screw driver
Mounting slot brackets:
– Phillips PH2 / (+) No. 2 screw driver
9.4.3.2

Preliminary steps

Before installing a Modular LAN controller, perform the following steps:
Ê Ensure to note down your current network settings in the operating system.
For further information, please refer to section
recovery" on page
"Disabling BitLocker functionality" on page 85
Ê
"Disabling SVOM boot watchdog functionality" on page 86
Ê
"Shutting down the server" on page 65
Ê
RX300 S7
225.
Upgrade and Maintenance Manual
Expansion cards and backup units
"Note on network settings
225

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents