Oracle Fujitsu SPARC M12-1 Service Manual page 125

Table of Contents

Advertisement

Table 7-11     System-Stopped/Cold Addition Work Procedure (Memory)
Item
Work Procedure
1
Opening the rack door
2
Switching the mode switch on the
operation panel to Service mode
3
Checking the operating condition
of the system and the I/O device
usage status
4
Stopping the system
5
Removing the power cords
6
Expanding memory
7
Installing the power cords
8
Performing a diagnosis test
9
Confirming that there is no
problem with the expanded memory
10
Returning the mode switch on the
operation panel to Locked mode
11
Starting the system
12
Closing the rack door
Reference
"5.2 Switching the Mode Switch to Service
"5.3 Checking the Operating Condition and Resource Usage
"5.5 Stopping the Entire
"5.8.1 Removing the Power
"16.5.1 Accessing the
MBU"
"16.6.2 Installing
Memory"
"16.6.3 Restoring the
Server"
"6.1.6 Installing the Power
"6.4 Diagnosing a Replacement
"6.7 Checking the FRU Status After
"6.8 Returning the Mode Switch to Locked
"6.9 Starting the
System"
Mode"
System"
Cords"
Cords"
FRU"
Maintenance"
Mode"
Chapter 7 Maintenance Flow
Status"
111

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fujitsu SPARC M12-1 and is the answer not in the manual?

Questions and answers

Table of Contents