7.3

FRU Addition Workflow

This section describes the addition workflow for the following FRUs of the SPARC
M12-1:
 
- PCIe card
- Memory
- HDD/SSD
7.3.1

Active Addition

This section describes the workflow for active/hot FRU addition. References to
detailed descriptions are written in the workflow. See any of them as required.
Active addition on the SPARC M12-1 has the following patterns:
Active/Hot addition (HDD/SSD)
Active/Hot addition (HDD/SSD)
Active/Hot addition can be performed on an HDD/SSD. Perform the following
procedure to add the unit.
Figure 7-7     Active/Hot Addition Flow (HDD/SSD)
1. Opening the rack door
2. Checking the operating condition of the
system and the I/O device usage status
3. Mounting an HDD/SSD
4. Incorporating the HDD/SSD by using the hot
plug function
5. Confirming that there is no problem with the
installed FRU
6. Closing the rack door
106
Fujitsu SPARC M12-1 Service Manual • January 2023
Addition complete