Maintenance Schedule - ABB IRB 365 Product Manual

Table of Contents

Advertisement

4.2.2 Maintenance schedule

Scheduled and non-predictable maintenance
The robot must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the table below.
Non-predictable situations also give rise to inspections of the robot. Any damage
must be attended to immediately.
Life of each component
The inspection intervals do not specify the life of each component. Values for these
are specified in the section
Maintenance schedule
Maintenance activities
Cleaning the robot
Inspecting the telescopic shafts
Inspecting the lower arms
Replacing the SMB battery pack
Replacing the ball bearing cup
Replacing the slide bearings
i
ii
iii The ball bearing cups is to be replaced every 12 months or every 3800 hours which ever comes
iv The slide bearings is to be replaced every 12 months or every 3000 hours which ever comes first
Product manual - IRB 365
3HAC079185-001 Revision: A
x
x
x
Operating hours counted by the DTC = Duty Time Counter
The battery is to be replaced at given maintenance interval or at battery low alert.
first
© Copyright 2022 ABB. All rights reserved.
Expected component life on page 74
ii
x
iii
x
iv
x
4 Maintenance
4.2.2 Maintenance schedule
Reference
Cleaning the IRB 365 on
page 95
Inspecting the telescopic
shafts on page 80
Inspecting the telescopic
shafts on page 80
Changing the SMB battery
on page 90
Replacing ball bearing cup
on page 120
Inspecting the telescopic
shafts on page 80
73