Getting Started; Unpacking And Initial Set Up - Teledyne 300E Instruction Manual

Carbon monoxide analyzer
Table of Contents

Advertisement

Model 300E Carbon Monoxide Analyzer
Instruction Manual

3. GETTING STARTED

3.1. Unpacking and Initial Set Up

1. Verify that there is no apparent external shipping damage. If damage has
occurred, please advise the shipper first, then T-API.
2. Included with your analyzer is a printed record of the final performance
characterization performed on your instrument at the factory. This record, P/N
04307, is an important quality assurance and calibration record for this
instrument. It should be placed in the quality records file for this instrument.
3. Carefully remove the top cover of the analyzer and check for internal shipping
damage.
Remove the set screw located in the top, center of the rear panel.
q
Remove the four screws fastening the top cover to the unit (two per side).
q
Lift the cover straight up. Do not slide backwards.
q
Some versions of the 300E CO Analyzer may have a spring loaded fastener at the top center of
the rear panel and as many as eight screws (four per side) fastening the top cover to the
chassis.
P/N 04288 REV: A
To avoid personal injury, always use two persons to lift
and carry the Model 300E.
Static sensitive parts are present on PCA (Printed Circuit
Assemblies).
Before touching PCAs, touch a bare metal part of
the chassis to discharge any electrostatic potentials or connect a
grounding strap to your wrist.
Never disconnect PCAs, wiring harnesses or electronic
subassemblies while under power.
CAUTION
NOTE
NOTE
CAUTION
Getting Started
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents