(Optional) Install The Server Into The Rack - Oracle X5-4 Service Manual

Hide thumbs Also See for X5-4:
Table of Contents

Advertisement

(Optional) Install the Server Into the Rack

13.
Secure the power cords with the power cord retaining clips.
Connect any other cables to their connectors or ports on the back of the server.
14.
If the cable management arm (CMA) is in the way, disconnect the left CMA release and swing
the CMA open.
15.
If necessary, reconnect the CMA.
See
"(Optional) Install Cable Management Arm" on page
Swing the CMA closed and latch it to the left rack rail.
16.
Power on the server.
See
"Power On the Server" on page
(Optional) Install the Server Into the Rack
When preparing the server for operation, use these optional steps to install the server in the
Before You Begin
rack.
Caution -
the rack by a single person. Use multiple personnel and a mechanical lift to install the server in
the rack.
262
Oracle Server X5-4 Service Manual • December 2015
Physical or component damage. The server is heavy and cannot be safely installed in
266.
271.

Advertisement

Table of Contents
loading

Table of Contents