Preparing to Service the Server
This section provides procedures for preparing the server for service.
Description
Procedural information for preparing to
perform hot service on the server.
Procedural information for preparing to
perform cold service on the server.
Procedural information for releasing the
Cable Management Arm (CMA)
Procedural information for server power-off
options.
Procedural information for using the Locator
indicator.
Procedural information for the server cover.
Prepare the Server for Hot Service
The following hot-service components can be removed and replaced while the server is
operating in full power mode:
Storage drives
■
Fan modules
■
Power supplies
■
For more information about component serviceability, see
Serviceability" on page
Important: Review the server Product Notes document before performing removal and
Before You Begin
■
installation procedures.
For troubleshooting information, see
■
Links
"Prepare the Server for Hot Service" on page 93
"Prepare the Server for Cold Service" on page 94
"Release the CMA" on page 98
"Powering Off the server" on page 101
"Managing the Locator Indicator" on page 107
"Remove the Server Cover" on page 110
70.
"Troubleshooting and Diagnostics" on page
"Component
Preparing to Service the Server
37.
93
Need help?
Do you have a question about the X5-4 and is the answer not in the manual?
Questions and answers