Oracle X5-4 Service Manual page 100

Hide thumbs Also See for X5-4:
Table of Contents

Advertisement

(Optional) Remove the Server from the Rack
Caution -
from the rack by a single person. Use two or more personnel and a mechanical lift to remove
the server from the rack.
Prepare the server for service.
1.
See
"Prepare the Server for Cold Service" on page
2.
Ensure that the server is in the maintenance position.
3.
Set up an ESD-safe service location.
Caution -
components that are extremely sensitive to static electricity. Do not touch or handle components
unless you are wearing a properly grounded anti-static wrist strap.
See
"Performing Electrostatic Discharge and Static Prevention Measures" on page
4.
Pull the mounting release brackets [1] toward the front of the server.
100
Oracle Server X5-4 Service Manual • December 2015
Physical or component damage. The server is heavy and cannot be safely removed
Component ESD damage. Circuit boards and hard drives contain electronic
94.
79.

Advertisement

Table of Contents
loading

Table of Contents