c.
Use a number 2 Phillips screwdriver and alternately tighten each screw one-
half turn until all screws are completely tightened.
Prepare the server for operation.
14.
See
"Prepare the Server for Operation" on page
15.
If the CPU being installed is replacing a faulty CPU, manually clear the CPU fault
using Oracle ILOM.
See
"Clear Hardware Fault Messages" on page
"Replace a Faulty CPU (FRU)" on page 180
See Also
■
"Replace the Motherboard (FRU)" on page 247
■
Install a Heatsink and CPU (FRU)
259.
91.
Servicing FRU Components
199