Prepare the Server for Operation
5.
Slide the top cover toward the rear of the server, so that the rear edge of the
cover slips under the retaining clip on the back wall of the server.
6.
Set the front edge of the cover on the server.
Ensure that the cover is properly seated and that both latches are fully engaged.
7.
Lift both latches and firmly push down on the front edge of the cover until both
latches lock with an audible click.
8.
Release the latches and verfy that the cover is locked down.
9.
(Optional) If you removed the server entirely from the rack, install it now.
See
"(Optional) Install the Server Into the Rack" on page
10.
To return the server to its normal rack position, do the following: