System Power-Up Recap - Datalogic Magellan 8300 Product Reference Manual

Hide thumbs Also See for Magellan 8300:
Table of Contents

Advertisement

System Power-Up Recap

NOTE
48
The System Power-Up procedure may vary depending upon the
requirements of your POS system. It is generally a good practice to
power-down (switch off) all equipment prior to connecting cables.
Check with your System Supervisor and/or refer to your POS termi-
nal manual for proper power-down and power-up procedures and
interface requirements when connecting any peripheral device.
If you have not identified any specific requirements for your POS
system, follow these steps.
1. Power-down the POS terminal.
2. Ensure that power is disconnected from the scanner.
3. Connect the scanner and scale interface cables to your POS
terminal. This connection may use one or two cables depend-
ing upon your POS terminal interface.
4. [EAS units ONLY] Connect the EAS interface cable.
SENSORMATIC EAS SYSTEMS:
Always Apply power to the EAS Controller box before powering on the
scanner.
5. Connect the Remote Display cable if your model is a scanner/
scale and make any connections to optional equipment, such
as a handheld scanner.
Magellan™ 8300/8400

Advertisement

Table of Contents
loading

This manual is also suitable for:

Magellan 8400

Table of Contents