Honda CBF600SA Service Manual page 198

Table of Contents

Advertisement

Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
FUEL SYSTEM (PGM-FI)
INSTALLATION
Install each insulator onto the throttle body while
aligning its groove with the lug on the throttle body.
Align the hole on each insulator band with the boss
on the insulator.
Confirm the direction of the insulator band screws
as shown.
Tighten the throttle body side insulator band screws
so that the width between the band ends is 7 ± 1
mm (0.28 ± 0.04 in).
Connect the throttle cables and tighten the lock
nuts.
Install the throttle body onto the air cleaner housing
(page 5-71).
5-84
email: info@motomatrix.co.uk
BOSSES
INSULATORS
#1, #2 INSULATOR BAND
#3, #4 INSULATOR BAND
10 ± 1 mm (0.39 ± 0.04 in)
THROTTLE CABLES
Align
LOCK NUTS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbf600nCbf600sCbf600na

Table of Contents