Park Lever Stop Inspection And Adjustment - Honda 2004 Odyssey Service Manual

Hide thumbs Also See for 2004 Odyssey:
Table of Contents

Advertisement

Transmission End Cover
End Cover, 3rd Gear, Idler Gear, and
3rd Clutch Removal (cont'd)
15. Remove the 3rd clutch assembly using the special
tool and a commercially available 3/8-16'' slide
hammer (A).
A
07736-A01000B or
07736-A01000A
16. Remove the splined washer, thrust needle bearing,
countershaft 3rd gear, needle bearing, and thrust
needle bearing from the countershaft.
17. Remove the mainshaft 3rd gear (A), secondary
shaft idler gear (B), and park gear (C) with a puller
(D).
D
C
B
18. Remove the park pawl, park pawl spring, park pawl
shaft, and stop shaft.
19. Remove the park lever from the control shaft.
20. Remove A/T clutch pressure control solenoid
valves A and B.
14-420
14-420
Park Lever Stop Inspection and
Adjustment
1. Set the park lever (A) in the P position.
D
2. Measure the distance (B) between the park pawl
shaft (C) and the park lever roller pin (D).
Standard: 84.6 85.6 mm (3.33 3.37 in.)
3. If the measurement is out of tolerance, select and
install the appropriate park lever stop (E) from the
table.
L1
A
PARK LEVER STOP
Mark
1
2
3
4. After replacing the park lever stop, make sure the
distance is within tolerance.
A
6 x 1.0 mm
14 N·m (1.4 kgf·m, 10 lbf·ft)
E
Part Number
L1
24537-PA9-003
11.00 mm
(0.433 in.)
24538-PA9-003
10.80 mm
(0.425 in.)
24539-PA9-003
10.60 mm
(0.417 in.)
C
E
B
L2
L2
11.00 mm
(0.433 in.)
10.65 mm
(0.419 in.)
10.30 mm
(0.406 in.)

Advertisement

Table of Contents
loading

Table of Contents