Acura 1994 Integra Service Manual page 456

Hide thumbs Also See for 1994 Integra:
Table of Contents

Advertisement

Measure the resistance between
the A3 and A25 or A26 terminals.
Chod. lor looro TCM connoctoB.
lf nocdaary. 3ubatltute a known-
good rolonold valv6 6ra6|nbly ot
TCM snd recheck.
ls the resistance I +16 07
Disconn€ct th6 3P conngctor from
the shift control solenoid valve
assembly.
Check for continuity between the
A3 and A25 or A26 terminals.
Ropair short to ground in GRt{/
WHT wiro botwoon th6 A3 tormi-
nrl and tho shitt control aolonoid
valve B.
Measure the resistance ot the
solenoid at the 3P connector.
Chock to. open in GRN/WHT wiro
b6twe.n th€ A3 lerminal and tho
shifl control solonoid valvo B.
ls the r€sistance 14- 16 O?
o o o o o o o o o o o o
o o o o o o o o o o o o
o o o o o o o o o o o
o o o o o o o o o o o
Roplace lhe rhift control solenoid
valve arr€mblv.
SHIFT CONTROL
SOLENOID VALVE
ASSEMELY
(cont'd)
14-65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integra 1994

Table of Contents