f4 Position
ihe line pressure (11 becomes line pressure (41 as it passes through the manual valve.lt then goes through line l2O)
to the 2nd clutch via the 1-2 and 2-3 shift valves. Also, line pressure (1 ) goes to the modulator valve through the filter
and becomes the modulator pressure (6). Modulator pressure (6) is not supplied to the 1-2, 2-3 and 3-4 shift valves
because the shitt control solenoid valves A and B are turned on by the TCM.
N O T E :
. When used, "left" or "right" indicates direction on the flowchart
. SOL-@: Shift Control Solenoid Valve A
. SOL-@: Shilt Control Solenoid Valve B
. SOL-O: Lock-up Control Solenoid Valve A
. SOt -@ : Lock-up Control Solenoid Valve B
(cont'd)
14-31