Acura 1994 Integra Service Manual page 444

Hide thumbs Also See for 1994 Integra:
Table of Contents

Advertisement

Me6sure the resistance between
the 46 and A25 or A26terminals.
Check for loos€ TCM connectors.
It necessary, substitute a known_
good solenoid valve assembly or
TCM and recheck.
Repair short to ground in YEL wiro
between tho AG t€rminal and th€
lock-uo control solsnoid valve A.
Ch€ck tor open in YEL wire bo-
tween the A6 terminal and the
lock-uD control solenoid valve A.
ls the resistance 14- 16 0?
RoDlaca th6 lock-up control sol€-
noid valv6 assembly.
Disconnect the 2P connector lrom
the lock-up control solenoid valve
Check Ior continuitv between the
46 and A25 or 426 terminals.
ls the resistance 14 16 O?
ls there continuity?
Measure lhe resistance of the
solenoid at the 2P connector.
{ c o n t ' d }
View lrom terminal side
1 4 - 5 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integra 1994

Table of Contents