Acura 1994 Integra Service Manual page 382

Hide thumbs Also See for 1994 Integra:
Table of Contents

Advertisement

Transmission
;
ReassemblV
1 . l n s t a l l t h e n e w o i l s e a l .
2. Set the change Piece.
3.
lnstall the shift rod.
4
Installthe steel ball, the spring, and the set screw.
5. lnstall the change piece attaching bolt.
6.
Install the shift rod boots.
8 x 1 . 0 m m
30 N.m 13.1 kg{ m.
SET SCREW
1 2 x ' 1 . 0 m m
22 N.m {2.2 kg{.m, 16lbl.ft}
SPRING
L. 25.6 mm
22 tbl.ltl
I n s t a l l t h e o i l c h a m b e r P i a t e .
SHIFT ROD
6 x 1 . 0 m m
12 N.m (1.2 kgt'm,9lbtft)
9 .
1 0 .
8. Install the differential assembly.
DIFFERENTIAL
ASSEMBLY
Set the spring washer and the washer.
Install the mainshaft, the countershaft, and the shift
fork assemblies.
N O T E : A l i g n t h e f i n g e r o t t h e i n t e r l o c k w i t h t h e
groove in the shift fork shaft.
MAINSHAFT
COUNTERSHAFT
SHIFT FORKS
(cont'd)
13-41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integra 1994

Table of Contents