2.6
Power
The PROWATCH
sure the mains voltage is compatible with the power supply voltage of the
equipment.
Switching On:
►
1
Press the switch on the back.
2
If the equipment is connected via HDMI™ to a monitor, you could see the
boot screen and also a progress bar that indicates the system is loading. At
the top left corner it shows the equipment model and firmware version.
3
After the system loads, it shows the last status used (mode and screen).
Switching Off:
►
1
Press the switch on the back.
2.7
Screen Icons and Dialog Boxes
On the screen are some icons that provide useful information to the user about
the current status of the instrument.
March 2025
is powered by a power cord connected to the mains. Be
Neo
Figure 30.
29
Chapter 2: SETTING UP
Need help?
Do you have a question about the PROWATCH Neo + and is the answer not in the manual?
Questions and answers