Hardware Guide
Table A-52 AC power cable label content
Content
MN-(B)-ACn
The label only contains information about the location of the equipment on the opposite end
of the cable as well as the power socket. Information about the local end is unnecessary.
Make sure that labels are affixed in the correct direction. That is, after the cable is bundled
with cable ties, the identification plates with labels should face up and the text on the labels in
the same cabinet should be in the same direction, as shown in
Figure A-90 Labels for AC power cables
Label for the power cable on the
loaded cabinet (namely cable
The labels in
l
l
A.6 Requirements for Customers' Cabinets Purchased
from Other Vendors
This section describes the requirements on customers' cabinets purchased from other vendors.
Cabinets purchased from other vendors must meet the following requirements:
Issue 03 (2017-12-15)
Description
MN: serial number of the cabinet or the socket where the power is led
in
B: chassis number, numbered bottom to top with two digits, such as 01.
n: power port number, numbered as 1 to 3 from bottom to top and left
to right.
Serial number of the socket where the power is led in: the location of
the socket is marked according to the actual situation. If the sockets can
be identified by row numbers and column numbers, they can be
numbered using the same rules as for the cabinets. If the sockets cannot
be identified by rows and columns, specify the precise location to avoid
confusion with other sockets.
TO:
A01
AC
position on the power
distribution cabinet)
Figure A-90
are described as follows:
On the loaded cabinet side, the label "A01-AC" indicates that the power cable is
connected to the socket of Row A and Column 01 in the machine room.
On the power socket side, the label "B01-AC1" indicates that the power cable is
connected to the AC power socket in Row B, Column 01 in the machine room.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
TO:
B01
AC
Label for the power cable on the
power distribution cabinet (namely
cable position on the loaded cabinet)
A Appendix