Huawei NIP6830 Quick Start Manual
Huawei NIP6830 Quick Start Manual

Huawei NIP6830 Quick Start Manual

Network intelligent protection system
Hide thumbs Also See for NIP6830:

Advertisement

Quick Links

HUAWEI NIP6830 Network Intelligent Protection System
Quick Start
Issue: 04
Date: 2018-11-07
Part Number:
31508202

Advertisement

Table of Contents
loading

Summary of Contents for Huawei NIP6830

  • Page 1 HUAWEI NIP6830 Network Intelligent Protection System Quick Start Issue: 04 Date: 2018-11-07 Part Number: 31508202...
  • Page 2: Trademarks And Permissions

    Huawei Technologies Co., Ltd. Notice The purchased products, services, and features are stipulated by the contract made between Huawei Technolo- gies Co., Ltd. and the customer. All or part of the products, services, and features described in this document may not be within the purchase scope or the usage scope.
  • Page 3: Installation Process

    Installation Process 1 Preparing the Site 2 Installing the Device Installing Floating Nuts and Guide Rails Installing Cabling Racks and Mounting Ears Mounting and Grounding Installing Boards and Daughter Cards Installing Fiber Spools 3 Cabling Connecting DC Power Cables Connecting AC Power Cables Connecting Optical Fibers and Network Cables 4 Power-On Check Power-On Check —...
  • Page 4: Preparing The Site

    Preparing the Site Before installing the device, ensure that the site meets the following requirements: Power Supply System If you use a DC cabinet, ensure that the outputs of the DC power distribution box fall within the range of –72 V DC to –38 V DC.
  • Page 5: Cabinet Requirements

    Cabinet Requirements Cabinet size: The height of the NIP6830 is 4 U (1 U = 44.45 mm) for DC cabinet and 5 U for AC cabinet. Airflow clearance: Maintain a minimum spacing of 2 U between devices installed in the same cabinet, between the top-most device and the cabinet top, and between the bottom-most device and the cabinet bottom.
  • Page 6 Installing Cable Racks and Mounting Ears Install the cable racks Distance L Install the mounting ears (between the mounting bar and inside of the front door) Note Before installing the mounting ears, measure the distance (L) between mount- ing bar and the front door. The way the mounting ear is installed depends on distance L, as shown in the following figures.
  • Page 7: Mounting And Grounding

    The NIP6830 is heavy and requires two people to lift and move. Use the handles on the chassis sides when moving the device. Do not use the handles of modules to avoid damages to the device.
  • Page 8 Installing Boards and Daughter Cards Warning Before installing boards and daughter cards, ensure that the device and cabinet are adequately grounded. Before handling a board or daughter card, wear a grounded ESP strap to avoid electrostatic damage to components. Slot Assignment CONSOLE CONSOLE LINK...
  • Page 9 Installing Fiber Spools Note You are advised to wind excess optical fibers around fiber spools for convenient cable routing and device maintenance. Determine the locations of the fiber spools based on the device arrangement in the cabinet. The fiber spools cannot be too close to device operation area to avoid hampering board insertion or removal or cabling, and the fiber spools cannot be too far away from the device to facilitate fiber spool operation.
  • Page 10: Connecting Dc Power Cables

    Connecting DC Power Cables Warning Before installing the power cables, ensure that the device is adequately grounded. Before connecting the power cable, switch power off on the power distribution box and power module. Do not work on cables with power to avoid bodily injury or fire. Power A Power B A1(-) A1(+) A2(-) A2(+)
  • Page 11: Connecting Ac Power Cables

    Power A Power B Power A CONSOLE CONSOLE LINK LINK RESET RESET MGMT-ETH MGMT-ETH PWR0 HUAWEI HUAWEI R4850G R4850G ~100-120V; ~100-120V; ~200-240V; ~200-240V; 50/60Hz;16A 50/60Hz;16A PWR0 PWR1 C19 straight female PI angle male...
  • Page 12 When handling optical fibers, do not stand close to, or look into the optical fiber outlet directly without eye protection. CONSOLE CONSOLE LINK LINK RESET RESET MGMT-ETH MGMT-ETH NIP-24XGE-SFP NIP-6X10G-SFP+ HUAWEI HUAWEI R4850G R4850G ~100-120V; ~100-120V; ~200-240V; ~200-240V; 50/60Hz;16A 50/60Hz;16A SFP+...
  • Page 13 Power-On Check — DC Power Warning Before power-on check, switch all power modules to the OFF position. Turn on the circuit breakers of external DC power supplies A and B. Measure the input voltage of the device with a multimeter and ensure that the voltage falls within the range of –72 V DC to –38 V DC.
  • Page 14 RUN Green, blinking once every two seconds RESET Front view of the AC cabinet MGMT-ETH CONSOLE CONSOLE LINK LINK RESET RESET MGMT-ETH MGMT-ETH Green,steady on ALARM Red, off HUAWEI HUAWEI R4850G R4850G ~100-120V; ~100-120V; ~200-240V; ~200-240V; 50/60Hz;16A 50/60Hz;16A PWR0 PWR1 STATUS Blinking green...
  • Page 15: Installation Checklist

    Installation Checklist After the installation, verify the installation against the following checklist. The result of each item must be pass. Check Item Result □ □ The device and boards are in good conditions. Pass Fail □ □ The cabinet is installed as required and adequately grounded. Pass Fail □...
  • Page 16 Configuring Console Access Connect a USB port on the PC to the console port of the board in slot 4 of NIP6830. CONSOLE CONSOLE LINK LINK CONSOLE CONSOLE LINK LINK RESET RESET MGMT-ETH MGMT-ETH MGMT-ETH MGMT-ETH HUAWEI HUAWEI R4850G R4850G ~100-120V;...
  • Page 17 Appendix: Requirements on Third-Party Cabinets If the cabinets are third-party cabinets, they must meet the following requirements: The cabinets must be 19-inch standard cabinets, with a depth larger than 800 mm and a spacing of 465 mm between the mounting holes on the left and right sides. The spacing between the mounting rails and the outer side of the cabinet door must be larger than 150 mm, the door thickness must be smaller than 25 mm, and the spacing between the mounting rails and the door must be larger than 125 mm.
  • Page 18: Label Location

    Appendix: Tie Wrapping and Labeling Tie Wrapping Requirements The spacing between power cables, ground cables, and signaling cables must be larger than 30 mm. Inside the cabinet, the cables must be tied neatly to form a rectangle cross section, and the cable ties must face the same direction. Each bundle cannot have more than 20 cables.
  • Page 19 Huawei Technology Co. Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129, P.R. China www.huawei.com...

Table of Contents