HUAWEI USG9500 Series
Hardware Guide
Step 6 Check the running status of the new SPC.
Check the running status of the new SPC in the following ways:
l
l
l
Issue 03 (2017-12-15)
Figure 3-14 Inserting an SPC into an SPU
Check the STATUS indicator on the panel of the SPC. If it is on (green), the SPC is
working normally.
Check the alarms. If the system does not generate any alarm related to the new SPC, the
SPC is working normally.
Run the display device command on the console interface to view the running status of
SPUs. If the SPUs in the corresponding slots are working normally, the following is
displayed:
<sysname> display device
USG9520's Device status:
Slot #
Type
Primary
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-
1
SPU
NA
2
LPU
NA
4
MPU
Master
5
MPU
Slave
6
CLK
Master
7
CLK
Slave
8
PWR
NA
9
PWR
NA
10
FAN
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1
Online
Register
Present
Registered
Present
Registered
Present
NA
Present
Registered
Present
Registered
Present
Registered
Present
Registered
Present
Registered
Present
Registered
3 Hardware Maintenance
Status
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
NA
2
362