Huawei USG9500 Series Hardware Manual page 315

Hide thumbs Also See for USG9500 Series:
Table of Contents

Advertisement

HUAWEI USG9500 Series
Hardware Guide
Figure 2-51 Slot layout
4
Step 2 Install a board.
1.
2.
3.
Figure 2-52 Installing a board
1
Step 3 Install a subcard.
1.
2.
3.
Figure 2-53 Installing a subcard
1
----End
Follow-up Procedure
Verify the following:
l
Issue 03 (2017-12-15)
MPU
LINK
LINK
RESET
RESET
MGMT-ETH
MGMT-ETH
LPU/SPU
LPU/SPU
LPU/SPU
Remove the filler panel from the selected slot.
Extend the ejector levels of the board, insert the board fully into the slot, and rotate the
ejector level to the front of the board.
Use a Phillips screwdriver to fasten the captive screws to the board.
NOTE
Before you install a subcard, remove redundant guide rails from the board and store them for future use.
Remove the filler panel from the board.
Smoothly insert the subcard into the board along the guide rail.
Use a Phillips screwdriver to fasten the captive screws to the board.
Boards and subcards are installed in the correct position and captive screws are tightly
fastened.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
MPU
5
LINK
LINK
RESET
RESET
ACT
ACT
3
2
1
2
b
a
b
2
2 Hardware Installation
3
3
303