Huawei USG9500 Series Hardware Manual page 331

Hide thumbs Also See for USG9500 Series:
Table of Contents

Advertisement

HUAWEI USG9500 Series
Hardware Guide
Context
Before performing a power-on check, switch all circuit breakers to the OFF position.
Before you power on the USG9580, ensure that:
l
l
Procedure
Step 1 Turn on external AC power supplies A and B.
Step 2 Measure the input voltage of the device with a multimeter. Ensure that the voltage falls
between 90 V AC and 264 V AC.
Step 3 Turn on the AC power switch of the device.
Step 4 Wait three minutes and then check the status of the indicators.
Figure 2-63
Table 2-11
Issue 03 (2017-12-15)
CAUTION
The power cable and PGND cable are properly connected.
The power switch in the equipment room is easy to locate so that you can quickly power
off devices in case of any problems.
shows the indicator status of main parts when the device is operating properly.
describes all indicators.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Hardware Installation
319

Advertisement

Table of Contents
loading

This manual is also suitable for:

Usg9520Usg9560Usg9580V300r001V500r001

Table of Contents