3. CONNECTION
3-1. PROCEDURES FOR MEASUREMENTS
This section describes necessary operations to be conducted prior to the actual measurements.
Section 3-2
To mount the WGA-910A
Section 3-3-1
To connect transducers
Section 3-3-2
Section 3-3-3
To connect [OUTPUT]
To connect the RS-232C
Section 3-3-4
Section 3-3-5
Section 3-3-6
Section 3-4
Chapter 4
on the panel
↓
↓
To connect [INPUT]
terminals
↓
terminals
↓
interface
↓
To monitor the analog
outputs
↓
To connect the power
supply
↓
SD card
↓
BASIC OPERATION
PROCEDURES
Mount the WGA-910A on the panel.
Connect various transducers to the WGA-910A.
Connect cables to the [INPUT] terminals.
Connect cables to the [OUTPUT] terminals.
Connect the RS-232C interface for communication
Connect the MONITOR connectors to monitor the voltage outputs,
proportional to the transducer outputs connected in 3-3.
Connect the AC power supply and ground the GND terminal.
Insert the SD card to save/load the setting values and to record the
waveforms.
Operate the WGA-910A and measure data.
For details, see "4. BASIC OPERATION PROCEDURES ".
19