Chapter 1
1.2.4.2 Inspection
0007-4603
- Checking the Operation of the Leakage Breaker
Advise the user to check the leakage breaker once or twice a month on a regular basis. Be
sure also to ask the user to keep a record of checks.
Inspection Procedure
1) Turn on the main power switch.
2) Push he test button [1] of the leakage breaker with the tip of a ball-point pen [2].
3) Check to make sure that the breaker switch shifts to the OFF side and the power is cut.
F-1-17
4) Turn off the main power switch.
5) Shift the breaker switch [1] back to the ON position.
F-1-18
1-46