ABB IRB 2400/L Product Manual page 212

Hide thumbs Also See for IRB 2400/L:
Table of Contents

Advertisement

5 Calibration information
5.5 Updating revolution counters
Continued
3
4
5
6
7
8
Continues on next page
212
Action
Select the desired unit and choose Rev Counter Update from the Calib
menu.
The Revolution Counter Update window appears.
xx0100000202
Select the desired axis and press Incl to include it (it will be marked
with an x) or press All to select all axes.
Press OK when all axes that are to be updated are marked with an x.
CANCEL returns to the Calibration window.
Press OK again to confirm and start the update.
CANCEL returns to the Revolution Counter Update window.
At this point, it is recommended that the revolution counter values are
saved to a diskette.
CAUTION
If a revolution counter is incorrectly updated, it will cause incorrect
manipulator positioning, which in turn may cause damage or injury!
Check the synchronization position very carefully after each update.
How to perform the check is detailed in section
ization position on page
215.
© Copyright 2004-2018 ABB. All rights reserved.
Note
Not required.
Checking the synchron-
Product manual - IRB 2400
3HAC022031-001 Revision: P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 2400 seriesIrb 2400/10Irb 2400/16Irb 2400

Table of Contents