ABB IRB 2400/L Product Manual page 152

Hide thumbs Also See for IRB 2400/L:
Table of Contents

Advertisement

4 Repair
4.5.2 Replacement of tie rod
Continued
2
3
4
5
6
7
8
9
10
11
152
Action
Make sure the weight of the upper arm is
properly secured.
Fit the new spherical roller bearings to the
tie rod using the press tool, parallel bar
bearing. Lubricate the bearings with bearing
grease.
Fit new bearing sealings to the shaft ends
and lubricate the shaft ends with grease.
Refit the tie rod, using the mounting tool,
parallel bar.
Note
Press by hand!
Fit new bearing sealings to the bearings.
Refit the back up ring.
Refit the locking washer.
Refit the attachment screw at both ends of
the bar, using locking liquid.
Recalibrate the robot!
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on page
© Copyright 2004-2018 ABB. All rights reserved.
Note
Use a crane!
Shown in the figure
page
149.
Art. no. is specified in
ment on page
150.
Shown in the figure
page
149.
Spare part no. is specified in
equipment on page
Art. no. is specified in
ment on page
150.
Shown in the figure
page
149.
Shown in the figure
page
149.
M8 x 16.
Loctite 243
Shown in the figure
page
149.
Calibration is detailed in a separate calib-
ration manual enclosed with the calibra-
tion tools.
General calibration information is in-
cluded in the section
tion on page
205.
First test
29.
Product manual - IRB 2400
3HAC022031-001 Revision: P
Location of tie rod on
Required equip-
Location of tie rod on
Required
150.
Required equip-
Location of tie rod on
Location of tie rod on
Location of tie rod on
Calibration informa-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 2400 seriesIrb 2400/10Irb 2400/16Irb 2400

Table of Contents