Weekly Maintenance

♦ Vacuum underneath the AMT, following these steps:
1.
Unplug the optional external power supply (when equipped) from
the AC outlet
2.
Remove the platform at the rear of the AMT.
3.
Carefully lift the rear of the AMT and move it to a temporary
location.
4.
Vacuum the rug or damp mop the floor.
5.
Make sure that the floor is dry before returning the AMT to its
original position and replacing the platform.
♦ Re-level the AMT to ensure that the two leveling feet are in contact
with the floor.
♦ Thoroughly test the AMT per,
including heart rate.
♦ Cardio Theater cord management must be observed.

Quarterly Maintenance

1.
Remove the side covers per,
procedure.
2.
Check the belt alignment and tension as in
Adjustment Procedures
3.
Clean the inside of the AMT.
4.
Inspect fasteners for proper tightness and torque.
5.
Check for excessive noise during vertical and horizontal
operation.
6.
Replace the side covers.
7.
Re-level the AMT to ensure that the two leveling "feet" are in
contact with the floor.
© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
Checking the AMT Operation
Cover Replacement
(on page 127).
(on page 125),
(on page 152)
Inspection and
Page 145

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amt 835Amt 885Amt 833Amt 823

Table of Contents