Upper Cable Duct - NEC Univerge sv8500 Manual

Fp85-110 s7
Hide thumbs Also See for Univerge sv8500:
Table of Contents

Advertisement

Cable Connection for DAP
The figure below shows how to run the DAP cables through the cable ducts.
Cable Connections and Cable Running of DAP
- Connect 2M AMI cables (I1-2PSA-IV-SMM L2) from INT connector to BWB through the upper cable duct.
- Connect DAP DC CA-A cable from PWR connector to BWB through the upper duct.
DAP card
30ELC
PWR
DAP DC CA-A
INT
2M AMI cable
LT0
LT1
SN4045
LT cable
DAP-B
FRONT VIEW
- Connect an LT cable to the LT connector on the DAP, and run the LT cable through the lower duct up to the cutting
of the REAR COVER.
Cutting of the REAR COVER
CHAPTER 2

UPPER CABLE DUCT

PWR
INT
DAP card
LT
LOWER CABLE DUCT
SIDE VIEW
REAR VIEW
AIR DUCT
REAR COVER
LT cables
AC 120V
VOL.3-288
TERMINAL-RELATED DEVICES
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
to MDF

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents