Download Print this page

Suzuki GA413 Service Manual page 52

Hide thumbs Also See for GA413:

Advertisement

1A-6 HEATER AND VENTILATION
1. Heater blower resistor
2. M terminal
3. H terminal
4. L terminal
INSTALLATION
1) Install heater unit by reversing removal procedure, noting the
following items.
D When installing each part, be careful not to catch any cable
or wiring harness.
D When installing steering column assembly, refer to Section
3C.
1. Heater unit
2) Adjust control cables. (Refer to HEATER CONTROL CABLES
2. Nut
3. Heater duct
in this section.)
4. Air inlet box
3) Fill engine coolant to radiator and bleed air from cooling system,
refer to Section 6B.
4) If equipped with air bag system, enable air bag system.
Refer to ENABLING AIR BAG SYSTEM in Section 10B.
HEATER BLOWER RESISTOR
REMOVAL
1) Disconnect battery (–) cable at battery.
2) Disconnect blower resistor lead wire at coupler.
3) Remove heater blower resistor.
INSPECTION
Measure the resistor for each terminal-to-terminal resistance.
Terminal-to-terminal
If the measured resistor is incorrect, replace the heater blower re-
sistor.
INSTALLATION
Reverse removal procedure for installation.
H–M
H–L
M–L
Resistance (W)
1.1
3.3
2.2

Hide quick links:

Advertisement

Chapters

loading