Mitsubishi Electric Q12DCCPU-V User Manual page 239

Melsec q series, c controller module
Hide thumbs Also See for Q12DCCPU-V:
Table of Contents

Advertisement

6
PREPARATORY PROCEDURES AND SETTING
Check the LEDs on each module for error.
If an error occurs in the C Controller module, troubleshoot
the problem, referring to the following.
(
CHAPTER 16)
If an error occurs in a CC-Link IE controller network
module, troubleshoot the problem, referring to the CC-Link
IE controller network module manual.
For actions to be taken with GX Works2/GX Developer,
refer to the following.
(
Page 6-22, Section 6.3 (4) (b))
If an error occurs in other than the C Controller module,
troubleshoot the problem, referring to the manual for the
module.
1) Create a user program with Workbench or Tornado.
2) Debug the user program.
3) Register the user program to the C Controller module.
4) Back up the standard RAM data not to lose them due to
expiry of battery life. (Q12DCCPU-V only)
(
Page 8-2, Section 8.1 1))
(a) Precautions
1
Troubleshooting
Programming
Operation
Figure 6.14 Flowchart for CC-Link IE controller network startup (continued)
When having replaced a C Controller module, restart all connected devices
(gateway server, personal computers, etc.)
(If any of these devices retains an Ethernet address of its communication target,
continued communication may be disabled after the replacement because the
Ethernet address is changed.)
Likewise, restart a C Controller module when a target device has been replaced.
C Controller Module User's Manual
(Utility Operation, Programming)
6.3 Preparatory Procedure and Setting
1
2
3
4
5
6
7
8
6
- 21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw3pvc-ccpu-eQ06ccpu-vQ06ccpu-v-b

Table of Contents