Mitsubishi Electric Q12DCCPU-V User Manual page 240

Melsec q series, c controller module
Hide thumbs Also See for Q12DCCPU-V:
Table of Contents

Advertisement

6
PREPARATORY PROCEDURES AND SETTING
6
- 22
6.3 Preparatory Procedure and Setting
(b) GX Works2/GX Developer and SW3PVC-CCPU
When performing troubleshooting according to the CC-Link IE controller network
module manual, actions to be taken with GX Works2/GX Developer are as
follows.
Table 6.4 GX Works2/GX Developer and SW3PVC-CCPU
GX Works2/GX Developer
CC IE Control Network Diagnostics
PLC diagnostics
Error code check
Sequence program check
Device test
Device batch monitor
Network parameter
Network range assignment
H/W test
Refresh parameters
Link start/stop
Routing parameters
Circuit test
Test between station
Communication test
Self-loopback test
SW3PVC-CCPU
Use the CC-Link IE Controller Network diagnostics result
screen of CC IE Control utility.
Use the System information screen of C Controller setting
utility.
Check the Module information tab or System information
screen of C Controller setting utility for error.
Check the user program for error.
Use Device monitoring utility.
Use Device monitoring utility.
Use the Parameter settings tab of CC IE Control utility.
Use the Network range assignment screen of CC IE Control
utility.
Use the Parameter settings screen of CC IE Control utility.
Use the Refresh parameter settings screen of CC IE Control
utility.
Use the Link start/stop screen of CC IE Control utility.
Use the Routing parameter settings screen of CC IE Control
utility.
Use the Parameter settings screen of CC IE Control utility.
Use the Parameter settings screen of CC IE Control utility.
Use the Communication test screen of CC IE Control utility.
Use the Parameter settings screen of CC IE Control utility.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw3pvc-ccpu-eQ06ccpu-vQ06ccpu-v-b

Table of Contents