Switch / Horn; Handle Switches; Start Switch - TGB BLADE 600 Service Manual

Table of Contents

Advertisement

16. ELECTRICAL SYSTEM

Switch / Horn

Main Switch
Inspection
Remove the front center cover.
Disconnect the main switch coupler.
Check the continuity between two points as
indicted below:
Pin
BAT1
Position
OFF
ON
Wire Color
Red/White
Replacement of main switch
Disconnect the coupler of the main switch.
Push out the main switch.
Align the main switch stopper with the meter
cover groove, and install main switch.
Install the main switch coupler.

Handle switches

Disconnect the coupler of handle from front
fender left side.
Check the continuity between two points as
indicated in the table below.

Start Switch

Pin
Position
FREE
Wire Color
Blue/White
16-16
BAT2
Brown/Blue
ST
SG
Black

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blade 500

Table of Contents