5. ENGINE REMOVAL
Remove the front and rear tube
.
Remove the front shaft bolts and springs.
Remove the selflock nut and take out the bolt.
Note: Install the selflock nut with specified
torque
(540~590 kgf-cm).
Remove the nut onto the bush and take down
engine bolster.(each side)
5-6