Cylinder Head Installation - TGB BLADE 600 Service Manual

Table of Contents

Advertisement

6. CYLINDER HEAD/VALVE

Cylinder Head Installation

Cylinder head Installation
For installation, reverse the removal procedure.
NOTE: Never invert front and rear cylinder
heads.
▪ Ensure dowel pins and key are in place.
NOTICE: Timing chain guide (fixed) has to be
fixed between cylinder and cylinder head.
▪ Install a NEW cylinder head gasket.
▪ First torque M10 cylinder head bolts with
LOCTITLE in cross sequence to 20 Nm+/- 1
Nm two times then finish by tightening to 180°
+/- 5°.
Caution
Do not damage the matching surfaces of
cylinder and cylinder head.
Avoid residues of gasket or foreign materials
falling into crankcase as cleaning.
Screw: M6:1.0~1.2kgf-m
Nut: M6: 1.0~1.2kgf-m
Install camshaft into cylinder head.
Install rocker arm, rocker arm shaft.
Install cam chain tensioner into cylinder head
Install 6 bolts on the stand for spindle,cam.
Bolt: 1.0~1.2 kgf-m
.
6-14
1
4
M6 screws
M6 nut
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blade 500

Table of Contents