TGB BLADE 600 Service Manual page 10

Table of Contents

Advertisement

● Lubricate the rotation face with specified
lubricant on the lubrication points before
assembling.
● Check if positions and operation for installed
parts is in correct and properly.
● Make sure service safety each other when
conducting by two persons.
● Note that do not let parts fall down.
● Before battery removal operation, it has to
remove the battery negative (-) cable firstly.
Notre tools like open-end wrench do not
contact with body to prevent from circuit
short and create spark.
1. GENERAL INFORMATION
● After service completed, make sure all
connection points is secured.
Battery positive (+) cable should be connected
firstly.
● And the two posts of battery have to be
greased after connected the cables.
● Make sure that the battery post caps are
located in properly after the battery posts had
been serviced.
● If fuse burned, it has to find out the cause and
solved it.
And then replace with specified
capacity fuse.
● When separating a connector, it locker has to
be unlocked firstly. Then, conduct the service
operation.
Capacity
verification
1-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blade 500

Table of Contents