Eps Unit Ground Circuit Test; Eps Unit Communication Link (Can) - TGB BLADE 600 Service Manual

Table of Contents

Advertisement

EPS Unit Ground Circuit Test

1. Disconnect the EPS ground connector (GDN)
2. Test for continuity between PINS to battery
ground.
EPS GND connector pin A + Battery GND
EPS GND connector pin B+ Battery GND
The voltage should be Continuity (close to 0
Ω
)
▪ If there is NO continuity or a high resistance is
measured, check wires and connector pins
from EPS unit to chassis ground post.
Replace or repair defective parts and reset
faulty codes.
▪ If there is good continuity, carry out the
following EPS UNIT COMMUNICATION LINK
(CAN) CONTINUITY TEST.

EPS Unit Communication Link (CAN)

Continuity Test
NOTE: EPS unit must receive an RPM signal to
provide power steering assist.
▪ Disconnect the EPS control connector and the
diagnostic connector.
▪ Test continuity of CAN Bus Wires at PINS.
EPS control connector (pin C) + diagnostic
connector (pin 1) = Below 1
EPS control connector (pin D) + diagnostic
connector (pin 2) = Below 1
▪ If resistance measured is out of specification,
check wires and connector pins. Carry out
repairs as required and reset faulty codes.
▪ If resistance measured is good, replace the
EPS unit and reset faulty codes.
15-2. ELECTRIC POWER STEERING
Ω
Ω
15-2-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blade 500

Table of Contents