© BT Prime-Mover, Inc.
Return
15. Refer to
see Figure 5-3 on page 165
installing ring terminals. Install ring terminal and
secure middle nut and torque to 79 in-lbs (8.9
N•m). Install ring terminal and secure outer nut,
making sure wire is out of the way, before torquing
outer nut to 79 in-lbs (8.9 N•m).
16. Install the upstop
and truck covers.
17. Connect the battery connector to the truck.
18. Turn main ON/OFF switch to the ON position.
Enter key code and press the green ON button "I"
on the keypad.
19. Check all operating functions on the control
handle.
Master Service Manual
2006-12-12
F-code
Section
PT
S5.0
Electrical Functions
Version no
T-code
002
SMX
(see Figure 5-4 on page
C-code
5000
when
166)
167