Gearshift Lever Construction; Gearshift Lever Removal And Installation - Suzuki GSX-R1000 Service Manual

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys

Gearshift Lever Construction

1. Gearshift lever bracket
2. Gearshift lever shaft
3. Washer

Gearshift Lever Removal and Installation

Removal
Remove the gearshift lever as shown in the gearshift
lever construction. Refer to "Gearshift Lever
Construction" (Page 5B-15).
email: info@motomatrix.co.uk / www.motomatrix.co.uk
2
(b)
3
4
4. Snap ring
5. Gearshift lever
"A": Footrest top surface
B947H15206010
" a "
1
(a)
5
"a": 65 – 75 mm (2.6 – 3.0 in)
: 28 N⋅m (2.8 kgf-m, 20.0 lbf-ft)
: 40 N⋅m (4.0 kgf-m, 29.0 lbf-ft)
Installation
1) Install the gearshift lever as shown in the gearshift
lever construction. Refer to "Gearshift Lever
Construction" (Page 5B-15).
2) After installing the gearshift lever, check the gearshift
lever height. Refer to "Gearshift Lever Height
Inspection and Adjustment" (Page 5B-16).
Manual Transmission:
B947H15206009
"A"
I947H1520058-02
: Apply grease.
: Do not reuse.
5B-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents