Regulator / Rectifier Construction; Regulator / Rectifier Removal And Installation - Suzuki GSX-R1000 Service Manual

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys

Regulator / Rectifier Construction

1
1. Regulator/rectifier
2. Regulator/rectifier bracket
3. Air intake pipe (RH)

Regulator / Rectifier Removal and Installation

Removal
1) Turn the ignition switch OFF.
2) Remove the right side cowling. Refer to "Exterior
Parts Removal and Installation" in Section 9D
(Page 9D-6).
3) Lift and support the fuel tank. Refer to "Fuel Tank
Removal and Installation" in Section 1G (Page 1G-
9).
email: info@motomatrix.co.uk / www.motomatrix.co.uk
FWD
(a)
FWD
5
"A"
4. Spacer
5. Wiring harness
"A": Connect the regulator/rectifier couplers under the wiring harness.
B947H11A06006
1
2
(a)
4) Remove the EVAP system purge control solenoid
valve bracket bolt. (E-33 only)
Charging System:
1J-7
B947H11A06005
3
4
(a)
I947H11A0020-03
: 10 N⋅m (1.0 kgf-m, 7.0 lbf-ft)
I947H11A0019-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents