Throttle Body Construction - Suzuki GSX-R1000 Service Manual

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys

Throttle Body Construction

(a)
1
FWD
(d)
4
(e)
1. Intake pipe
2. EVAP system purge control solenoid valve
(E-33 only)
3. EVAP canister (E-33 only)
4. IAT sensor
5. ISC valve hose
6. HO2 sensor
"A": Face the clamp end left side.
"B": Yellow marking should face upward.
email: info@motomatrix.co.uk / www.motomatrix.co.uk
(c)
(b)
2
"A"
"B"
"3"
"5"
"2"
"4"
"I"
5
"F"
"E"
"G"
"C": Face the end of clamps upward and keep clearance
from the seat rail and fuel tank.
"D": Arrange the hose and wiring harnesses in parallel to
the frame bridge.
"E": Yellow paint should face downward.
"F": Face the clamp end backward.
"G": Face the clamp end downward.
"H": Tighten the bolts in the ascending of numbers.
"I": Route the fuel pump lead wire above the fuel nipple.
"J": Pass the HO2 sensor lead wire between the frame
and engine.
(d)
"C"
"7"
"2"
"1"
"5"
"4"
"H"
(d)
"J"
"1" "6"
6
(g)
Engine Mechanical:
B947H11406009
3
"D"
"K"
"G"
"H"
(f)
"6"
"3"
I947H1140253-03
"K": Face the clamp end right side.
: 8.5 N⋅m (0.85 kgf-m, 6.5 lbf-ft)
: 1.5 N⋅m (0.15 kgf-m, 1.0 lbf-ft)
: 7 N⋅m (0.7 kgf-m, 5.0 lbf-ft)
: 10 N⋅m (1.0 kgf-m, 7.0 lbf-ft)
: 1.3 N⋅m (0.13 kgf-m, 1.0 lbf-ft)
: 4.3 N⋅m (0.43 kgf-m, 3.0 lbf-ft)
: 25 N⋅m (2.5 kgf-m, 18.0 lbf-ft)
1D-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents