Throttle Cable Play Inspection And Adjustment; Pair System Inspection; Throttle Valve Synchronization; Cooling System Inspection - Suzuki GSX-R1000 Service Manual

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys

Throttle Cable Play Inspection and Adjustment

Inspect throttle cable play
Initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Inspect and adjust the throttle cable play "a" as follows:
Throttle cable play "a"
2.0 – 4.0 mm (0.08 – 0.16 in)
1) Remove the boot (1).
2) Loosen the lock-nut (2) of the throttle pulling cable.
3) Turn the adjuster (3) in or out until the throttle cable
play "a" (at the throttle grip) is within 2 – 4 mm (0.08
– 0.16 in).
4) Tighten the lock-nut (2) while holding the adjuster
(3).
5) Fit the boot (1) positively onto the adjuster.
1
2
WARNING
!
After the adjustment is completed, check that
handlebar movement does not raise the
engine idle speed and that the throttle grip
returns smoothly and automatically.

PAIR System Inspection

Inspect PAIR system
Every 12 000 km (7 500 miles, 24 months)
Inspect the PAIR (air supply) system periodically. Refer
to "PAIR System Inspection" in Section 1B (Page 1B-9).
email: info@motomatrix.co.uk / www.motomatrix.co.uk
B947H10206011
" a "
I947H1020038-01
3
I947H1020013-02
B947H10206012
Maintenance and Lubrication:

Throttle Valve Synchronization

Inspect throttle valve synchronization
Initially at 1 000 km (600 miles, 2 months) (E-33 only)
and every 12 000 km (7 500 miles, 24 months)
Inspect the throttle valve synchronization periodically.
Refer to "Throttle Valve Synchronization" in Section 1D
(Page 1D-16).

Cooling System Inspection

Inspect cooling system
Every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
Every 2 years
Engine Coolant Level Inspection
1) Hold the motorcycle vertically.
2) Check the engine coolant level by observing the "F"
and "L" lines on the engine coolant reservoir tank. If
the level is below the "L" line, add engine coolant to
the "F" line from the engine coolant reservoir tank
filler (1) behind the right side cowling. Refer to
"Exterior Parts Removal and Installation" in Section
9D (Page 9D-6).
0B-12
B947H10206013
B947H10206014
I947H1020035-01
1
I947H1020054-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents