Suzuki GSX-R1000 Service Manual page 300

Hide thumbs Also See for GSX-R1000:
Table of Contents

Advertisement

Manuals by Motomatrix / The Solution For Lost Motorcycle Coded Keys
1D-66 Engine Mechanical:
Oil Pressure Switch
• Apply bond to the thread part of oil pressure switch
and tighten oil pressure switch to the specified torque.
NOTE
Be careful not to apply bond to the hole of
thread end.
: Sealant 99000–31140 (SUZUKI BOND
No.1207B or equivalent)
Tightening torque
Oil pressure switch: 14 N·m (1.4 kgf-m, 10.0 lbf-ft)
• Route the oil pressure switch lead wire properly and
tighten the screw to the specified torque. Refer to
"Wiring Harness Routing Diagram" in Section 9A
(Page 9A-7).
Gear Position Switch
• Apply grease to the O-ring.
CAUTION
!
Replace the O-ring with a new one.
NOTE
Insert the gear position switch pin "A" into
the gearshift cam hole "B".
: Grease 99000–25010 (SUZUKI SUPER
GREASE "A" or equivalent)
email: info@motomatrix.co.uk / www.motomatrix.co.uk
I718H1140233-01
"B"
"A"
I947H1140202-01
• Tighten the gear position switch mounting bolts to the
specified torque.
Tightening torque
Gear position switch mounting bolt (a): 6.5 N·m (
0.65 kgf-m, 4.7 lbf-ft)
Water Pump
• Apply grease to new O-ring (1).
CAUTION
!
Use the new O-ring to prevent oil leakage.
: Grease 99000–25010 (SUZUKI SUPER
GREASE "A" or equivalent)
• Install the water pump assembly with the slot of the
pump shaft end "A" securely engaged with the flat "B"
of the oil pump shaft.
1
(a)
I947H1140203-01
"B"
"A"
I947H1140204-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents