3) Remove the belt [1], E-ring [2], gear [3], parallel
pin [4], and plate [5].
[1]
[2]
[5]
F-4-74
4) Remove the ball bearing [1], washer [2]; E-ring
[3], and ball bearing [4].
F-4-75
[3]
[4]
[1]
[2]
[3]
[2]
[4]
5) Remove the ball bearing [1] in downward
direction, detaching the delivery roller [2] at the
same time.
[2]
[1]
F-4-76
6) Detach the E-ring [2] and the ball bearing [3] from
the stack delivery roller [1].
[3]
[2]
F-4-77
Chapter 4
[1]
4-19