Download Print this page

Toshiba e-STUDIO556 Service Manual page 278

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO556:

Advertisement

4.11.1
Heater control PC board (IH board)
(1)
Open the front cover. Then pull out the
transfer/transport unit by turning its handle
clockwise.
(2)
Remove 2 screws and open the IH cover-1
carefully to the front side.
(3)
Remove 4 screws and then release 4 power
supply harnesses of the IH coil.
Notes:
1. Be sure that each of these harnesses is
connected to the proper position.
2. Use tightening torques of 1.2-2.0 N•m for
the 4 screws connecting these power
supply harnesses.
3. Since the IH board is a high-voltage
section, be sure to pull out the power
cable before starting maintenance or
checking. Especially do not touch the
IGBT when the power is ON since it is
generating high-voltage.
e-STUDIO556/656/756/856/557/657/757/857
DISASSEMBLY AND REPLACEMENT
IH cover-1
Screw
IGBT
© 2011 - 2014 TOSHIBA TEC CORPORATION All rights reserved
4 - 114
Fig. 4-317
Screw
Fig. 4-318
Red
Blue
Black
( Without tag )
Fig. 4-319

Advertisement

loading