Porsche 928 Workshop Manual page 619

Hide thumbs Also See for 928:
Table of Contents

Advertisement

Fuel System I Electronic
Control
No display:
Disconnect the engine speed sensor plug con-
nection at the plug strip in the engine compart-
ment. Using test leads, connect the lead from
the tester to the center and outer plug contact
(terminals 1 and 2. pin side). Start the engine.
The sine wave pattern must be displayed on
the screen.
Engine speed sensor plug
Note
If connection
3 is grounded, the image must
not change.
If it changes, check sensor for continuity,
cor-
rect gap and freedom from dirt.
Test point 14: ignition circuit
monitoring
(refer to test point 10,
LH test plan)
If the exhaust gas temperature
changes, for in-
stance on account of misfiring, the faulty injec-
tion circuit is shut down. The engine then runs
on 4 cylinders.
An ignition circuit monitoring
relay at the
LH/EZK control unit controls this protective
device. 2 light-emitting
diodes on the relay
housing show which injection circuit has been
shut down. For repairs, refer to 926 Repair Pro-
cedures, volume I-A, page 28-77.
Test point 15: Ignition system - output stages
Checking ignition timing
At idle speed
928 GT
675 + 25 l/min
10" bTDC f 2"
775 + 25 llmin
lVbTDCt2"
D 28 - 12
EZK-Diagnosis/Troubleshooting
Primed in Germany - xxv, ,990

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents